Extreme cold became the solution at Glasgow University

Kunde
FES Limited Glasgow University, Western Campus Development
Land
Vereinigtes Königreich
Anwendung
Local & district heating
Bauzeit
2019 - 2021
Produktlösungen
- 800 metres ø219/355 series 2 with branches to new building
- plots varying in size from 88/180
- to 114/225 and all with fusion welded joints
Unique solution
Combining the new and the existing district heating networks required that the old valves in the system had to be replaced. This was a challenge for ISOPLUS UK, because 46 m³ water had to be drained off and then
replenished again. This would have meant an expansive and prolonged shutdown with mayor inconveniences to the university. Therefore, ISOPLUS UK decided on a unique solution, which allowed the campus to maintain normal activities during the installation of our new series 2 of Ø 219/355 valves. The solution was to cryogenically freeze the existing network.